Pit TraceF1 Engineering Intel
All circuits
street
1 weekend · 39 confirmed

Albert Park Circuit

Demand
DownforcemedBrakingmedTractionmedTyremedCoolingmed

Weekends

Confirmed packages

1 circuit specific across 1 weekend · 1 per weekend here · season average 1.8

Clear filters

2026 · R01 Australian
Floor EdgePerformanceFlow ConditioningRevisedConfirmed

The 2026 Technical Regulations introduce a revised layout for the Floor Edge.

The floor edge incorporates a multi-slot geometry combined with an upper fence, engineered to mitigate tyre-contact-patch–induced pressure losses and reinforce the robustness of the floor’s sealing vortex system. This configuration enhances shear-layer stability, preserves underfloor mass-flow continuity, and reduces the susceptibility of the diffuser to wake-related load drop-off.

Similar circuits

No distinctive demand to cluster