Pit TraceF1 Engineering Intel
All circuits
street
1 weekend · 39 confirmed

Albert Park Circuit

Demand
DownforcemedBrakingmedTractionmedTyremedCoolingmed

Weekends

Confirmed packages

1 circuit specific across 1 weekend · 1 per weekend here · season average 1.8

Clear filters

2026 · R01 Australian
Front WingPerformanceLocal LoadRevisedConfirmed

Revised to comply with 2026 regulations.

Up to 3 elements for 2026 by regulation, with allowance to attach at either first or second element with those rearward able to move for balance and SM drag reduction. The ORBR design attaches at the first element allowing both flaps to perform the SM/CM change.

Similar circuits

No distinctive demand to cluster