Pit TraceF1 Engineering Intel
All circuits
street
1 weekend · 39 confirmed

Albert Park Circuit

Demand
DownforcemedBrakingmedTractionmedTyremedCoolingmed

Weekends

Confirmed packages

1 circuit specific across 1 weekend · 1 per weekend here · season average 1.8

Clear filters

2026 · R01 Australian
Front WingPerformanceLocal LoadConfirmed

Compared to the 2026 starting point, the R01 front wing has increased camber and no strake.

Increasing element chamber increases the front wing load, with the spanwise loading chosen to optimise the onset flow to the floor.

Similar circuits

No distinctive demand to cluster