Pit TraceF1 Engineering Intel
All circuits
street
1 weekend · 39 confirmed

Albert Park Circuit

Demand
DownforcemedBrakingmedTractionmedTyremedCoolingmed

Weekends

Confirmed packages

1 circuit specific across 1 weekend · 1 per weekend here · season average 1.8

Clear filters

2026 · R01 Australian
Floor BodyPerformanceLocal LoadRevisedConfirmed

The 2026 Technical Regulations introduce a revised layout for the Floor.

The 2026 floor architecture features a predominantly flat underbody, with only a limited allowance for front inboard devices and a floorboard as defined by the regulations. Our geometry incorporates a substantial vertical vane to condition and manage the tyre-wake structures, complemented by a series of horizontal aerofoils that promote localised load extraction. This combination enhances vortex stability, preserves floor sealing, and improves the underfloor mass-flow distribution.

Similar circuits

No distinctive demand to cluster